2009 Parks Department Current Year Projects
Northeast Park
- Playground Equipment 2-5 year old structure
- Amenities
- Concrete access walk (100’ x 10’)
- Fabric/resilient surfacing
- Concrete footings
- Benches (both structures) (8)
- Steel Framed (existing)
- Expanded metal plastisol
- Waste receptacles (4)
- Steel framed
- Expanded metal plastisol
- Playground Equipment Cost with
- Steel framed bench w/receptacle
- Expanded metal plastisol
- Trail Extension
- Adjacent 2nd Street NE from 22nd Avenue NE to Northeast Park west parking lot (340’ x 10’ wide)
- Service entrance from new trail to center circle (80’ x 10’)
- Two parking lot extension to existing trail (70’ x 10’)
- Concrete Walks
- Parking lot perimeter and walk to play equipment (440’ x 10’)
- Soccer east player benches
- Parking lot lights and wire
- Landscaping