2009 Parks Department Current Year Projects

Northeast Park

  • Playground Equipment 2-5 year old structure
    • Amenities
      • Concrete access walk (100’ x 10’)
      • Fabric/resilient surfacing
      • Concrete footings
      • Benches (both structures) (8)
        • Steel Framed (existing)
        • Expanded metal plastisol
      • Waste receptacles (4)
        • Steel framed
        • Expanded metal plastisol
      • Playground Equipment Cost with
        • Steel framed bench w/receptacle
        • Expanded metal plastisol
  • Trail Extension
    • Adjacent 2nd Street NE from 22nd Avenue NE to Northeast Park west parking lot (340’ x 10’ wide)
    • Service entrance from new trail to center circle (80’ x 10’)
    • Two parking lot extension to existing trail (70’ x 10’)
  • Concrete Walks
    • Parking lot perimeter and walk to play equipment (440’ x 10’)
    • Soccer east player benches
  • Parking lot lights and wire
  • Landscaping