2024 Planned Electric Utility Projects

  • Overhead to Underground Conversion - 6th St SW & 7th St SW
  • Paint/Seal SW Utility Garage Exterior
  • Switch Gear Replacement (annual throughout the City)
  • Transformers (annual throughout the City)
  • SCADA (Supervisory Control and Data Aquisition)/Load Control Equipment (ongoing)
  • Substation Improvements (ongoing)
  • Meter Replacements at various locations throughout the City
  • 500 MCM Replacement from Kellings S&C Switch to Oak Park S&C Switch