General Water Park Information

The Waseca Water Park and adjacent parking area is located within City-owned Northeast Park, easily accessible by car, bus, bicycle, or even on foot. It was built in 2006 and 2007 at a cost of $3.6 million with over $1.5 million coming from private donations.

The Water Park pool is heated to a temperature of 81 degrees.

Design and Construction 

Numerous local area contractors and suppliers participated in building the Waseca Water Park including James Bros. Construction, Elysian; Crane Creek Asphalt, Owatonna; Rocon, Owatonna; Dahle Sod Farm, Morristown; JTD Contracting, Waseca; CJ Masonry, Waseca; Associated Lumber Marts, Waseca; Rightway Painting, Owatonna; Ockwig Construction, Waseca; Waseca Glass, Waseca; Olympic Fire Protection, Owatonna; ALM Builders, Waseca; and Coles Electric, Owatonna.

Architects and Engineers: Bonestroo, Rosene, Anderlik and Associates, St. Paul, MN

Construction Manager: Bob Mickelson, ALM Builders, Waseca, MN

Thank you for your support of the Waseca Water Park!