2024 Planned Sanitary Sewer Projects
- Inflow & Infiltration (I&I) improvements
- Skid Loader replacement (annual lease shared with Street Department)
- Collection System Lift Station Pump & Motor rebuilds (multi-year program)
- WWTP Chemical Building (rooftop HVAC replacement)
- WWTP Chemical Injector Pumps rebuild
- WWTP Raw Sewage Pump rebuild and valve replacement
- WWTP Main Pump Motor Drive replacement/SCADA improvements
- Engineering design of 8th Ave NE Sanitary Sewer infrastructure from 3rd St to Clear Lake Drive
- Aeration Blower design and replacement (multi-year project)