2024 Planned Sanitary Sewer Projects

  • Inflow & Infiltration (I&I) improvements
  • Skid Loader replacement (annual lease shared with Street Department)
  • Collection System Lift Station Pump & Motor rebuilds (multi-year program)
  • WWTP Chemical Building (rooftop HVAC replacement)
  • WWTP Chemical Injector Pumps rebuild
  • WWTP Raw Sewage Pump rebuild and valve replacement
  • WWTP Main Pump Motor Drive replacement/SCADA improvements
  • Engineering design of 8th Ave NE Sanitary Sewer infrastructure from 3rd St to Clear Lake Drive
  • Aeration Blower design and replacement (multi-year project)